Go to main content

KP-1865 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Buried asphalt membrane showing condition of healed joint. Lap was welded together with burner. Test hole was dug half-way up north bank and 40 feet from Pumping Plant "H"; December 21, 1949; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History