Go to main content

KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has settled ahead of dragline about 18 inches and bank behind dragline has started to settle and move out at about 1/4" per hour; May 14, 1957; Photo by K. J. Greene

Metric
From
To
Interval
Export
Download Full History