Go to main content

KP-1896 - Klamath Project. Lower Cost Canal Lining. Asphalt sheets farther down channel are all laid with the paper-side down. Edges are flowed with RC-0; December 14, 1949; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History