Go to main content

KP-1904 - Klamath Project. Lower Cost Canal Lining. N-16 Lateral. Between Sta. 84-30 & 84-60, a transition takes place where the regular 10-ft. bottom becomes a 6-ft. bottom. Picture shows also the crew at work. George Browning standing on south side of channel inspecting; December 28, 1949; Photo by Andrew M. Bergloff

Metric
From
To
Interval
Export
Download Full History