Roll 2 No. 6 - Klamath Project. Note that horizontal construction joint is badly weathered. As in "A" Canal concrete lining shown in previous pictures, horizontal joint is badly weathered indicating the retention of moisture on the horizontal joint subjects the joint to more severe weathering due to freezing action; October 19, 1948; Photo by H. F. Tolley