P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene torch was used to cut a hole in the steel sleeve; April 4, 1978; USBR photo by D.J. Kline