P-12-201-4297 NA Klamath Project, OR-CA. Work begins on dike to pretect (sic) jobsite from flooding in event pumping plants should shut off, causing Kl. Straits Drain to rise. Overall view of excavation area from west to east. Contractor was informed of potential flooding if pumping plants would shut down and this was what he decided to do; December 1976; USBR photo by D. J. Kline