P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Title
Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor
Original photograph: 10 x 13 cm, black & white photo, caption under photo reads "P12-201-4563NA Klamath Project, OR-CA Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; Apr. 4, 1978; USBR photo by D.J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4563NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation