P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April 4, 1978; USBR photo by D.J. Kline
Title
Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor
Original photograph: 10 x 13 cm, black & white photo, caption under photo reads "P12-201-4564NA Klamath Project, OR-CA Kl. Str. Drain Enl., Phase II, Specs. 200C-954 - RHC Constr., Inc., Contractor Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; Apr. 4, 1978; USBR photo by D.J. Kline", from Black Binders Digital reproduction of photograph: P12-201-4564NA Klamath Project, OR-CA, Black Binders, Bureau of Reclamation