Go to main content

P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April 4, 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History