Go to main content

KP-1303-R2--Klamath Project. Region II. Boundary Dam Materials Investigation. Carr Butte area PH #9 showing rotary drill and drilling operations, sand silt material on lower part of NW slope of Carr Butte; February 6, 1947; Photo by Dorwin Grise

Metric
From
To
Interval
Export
Download Full History