Go to main content

P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; USBR photo by D.J. Kline

Metric
From
To
Interval
Export
Download Full History